Garden Pic Wednesday: What's Blooming Now
While I love our new floor, I didn't love how the installers put the trim back on the base-boards. They were here from 10 to 3 this last Saturday, the 4th day of what should of been a 2-day job, because their Dad, who was the carpet store manager, kept calling them to go do this and that all over the county. So they kept disappeared for hours at a time. On Saturday absolutely all the grouting was still left to do throughout the main body of the house, plus they needed to put all the wood trim back in place. But it was Saturday and they didn't want to stay till 5pm, so they rushed everything. Now, if they'd done an excellent job replacing the trim, I might been able to over-look the delay, but they did a horrible, horrible job with the trim . I found trim segments just resting in place without nails , trim jammed into place in such a way as to splinter both trim ends and the base board, nails not hammered all the way in or tri...